CEVA Logistics, a major player in the international logistics sector, turned to our team to renovate, modernise and extend a business facility in Satolas-et-Bonce (38). The redevelopment project was guided by a genuine desire to enhance and transform the existing building.

A 1,900 sq. metre extension for new warehouse o๏ฌƒces, adaptation of the existing cells, redevelopment of the exterior, installation of a photovoltaic plant and a shading system and charging points in the car parks: this comprehensive redevelopment improved both the energy performance of the building and its functionality.

To meet our clientโ€™s growing productivity needs, we worked together on the installation of new, high-performance and innovative intralogistics solutions. This was a major technical challenge since the new equipment had to ๏ฌt in with both the con๏ฌguration of the site and CEVA Logistics’ speci๏ฌc processes.

Find out more about our “Logistics buildings“.

Satolas-et-Bonce โ€“ LYON EST (38)

Developer-builder (PDA)

42,000 mยฒ

Installation of a 1.6 MW photovoltaic power plant